Welland Canal
- Locks 1 & 2
The Welland Canal is a crucial transportation route. PDI has been tasked to remove 2500 cubic metres of concrete from 6 sections (each 100 feet deep) of canal wall to make way for an upgraded tie-up system that will modernize the process moving ships through the canal and increase the efficiency of this transportation hub. They need to be finished and out of the lock in 13 days.

